Decommissioning Research Reactor BER II
Decommissioning and Dismantling
The Berlin experimental reactor BER II of Helmholtz-Zentrum Berlin für Materialien und Energie (HZB) reached the end of its planned lifecycle and was shut down permanently at the end of 2019. The date for its shutdown had been finalised by the HZB Supervisory Board in 2013.
The reactor basin in BER I during the time of its operation. © HZB / B. Ludewig